Bagan Siapi-api Powerplant

From Enipedia
Jump to: navigation, search


Contents

General

Operator:
Year first built:
Owner company: Pt PLN Persero
Other names:
Status:

Data Links

Search other databases (experimental)
Carma.org ID: 2838. (original data source)
Wikipedia: Unknown - search Wikipedia-logo-no-name.svg
DBpedia:
Wikimapia:
OpenStreetMap:
Industry About:

Location

City: Bagan Siapi-api
Metro area:
County:
State:
Country: Indonesia
Zip code:

Power Conversion Units

List of Power Conversion Units:

Add New Power Generating Unit:

  • click here to create with auto-generated name
    • (creates incremental names - Unit 1, Unit 2, etc.)
  • or below enter in a specific name (e.g. "Reactor Number 2")

You can edit this page and help us improve the information here.

Maps

See also:
Loading map...

View same area on ITO Map Electricity generation,
OpenStreetMap Openstreetmap logo small.png, Wikimapia Wikimapia logo small.png,Wikipedia Wikipedia-logo-no-name.svg, or Bing

Energy

(Definitions of Terms Used Below)

Fuel type:
Primary fuel type:
Cooling method:
Power plant use:
Efficiency:  %
Power output (electrical):
(nameplate capacity)
Power output (thermal):
(nameplate capacity)
Operating cost:

Availability


Heat production


Fuel consumption


Electricity production (Source: carma.org)

MWh year
540.00 2000
731.00 2007
842.00 2020

Emissions (Source: carma.org)

name emissions_kg year
Carbon Dioxide 400,068.00 2000
Carbon Dioxide 527,074.00 2007
Carbon Dioxide 600,556.00 2020

References and notes (no data)

527,074.339 kg
527.074 tonne
400,068.474 kg
400.068 tonne
600,556.304 kg
600.556 tonne
721.666 kg
0.722 tonne
740.717 kg
0.741 tonne
713.047 kg
0.713 tonne


Facts about Bagan Siapi-api PowerplantRDF feed
Annual Carbonemissions2000 kg400,068.474 kg (400.068 tonne) +
Annual Carbonemissions kg527,074.339 kg (527.074 tonne) +
Annual Carbonemissionsnextdecade kg600,556.304 kg (600.556 tonne) +
Annual Energyoutput2000 MWh540 MWh +
Annual Energyoutput MWh731 MWh +
Annual Energyoutputnextdecade MWh842 MWh +
CarmaId2838 +
CityBagan Siapi-api +
ContinentAsia +
CountryIndonesia +
Intensity2000 kg CO2 per MWh elec740.717 kg (0.741 tonne) +
Intensity kg CO2 per MWh elec721.666 kg (0.722 tonne) +
Intensitynextdecade kg CO2 per MWh elec713.047 kg (0.713 tonne) +
Latitude2.158 +
Longitude100.816 +
OwnercompanyPt PLN Persero +
Point2.157713 N, 100.8162 ELatitude: 2.157713
Longitude: 100.8162
+
Personal tools
Namespaces

Variants
Actions
Navigation
Portals
Advanced
Toolbox