Banjarmasin (asam-asam) Powerplant

From Enipedia
Jump to: navigation, search


Contents

General

Operator:
Year first built:
Owner company: Pt PLN Persero
Other names:
Status:

Data Links

Search other databases (experimental)
Carma.org ID: 3196. (original data source)
Wikipedia: Unknown - search Wikipedia-logo-no-name.svg
DBpedia:
Wikimapia:
OpenStreetMap:
Industry About:

Location

City: Banjarmasin
Metro area:
County:
State: South Kalimantan
Country: Indonesia
Zip code:

Power Conversion Units

List of Power Conversion Units:

Add New Power Generating Unit:

  • click here to create with auto-generated name
    • (creates incremental names - Unit 1, Unit 2, etc.)
  • or below enter in a specific name (e.g. "Reactor Number 2")

You can edit this page and help us improve the information here.

Maps

See also:
Loading map...

View same area on ITO Map Electricity generation,
OpenStreetMap Openstreetmap logo small.png, Wikimapia Wikimapia logo small.png,Wikipedia Wikipedia-logo-no-name.svg, or Bing

Energy

(Definitions of Terms Used Below)

Fuel type:
Primary fuel type:
Cooling method:
Power plant use:
Efficiency:  %
Power output (electrical):
(nameplate capacity)
Power output (thermal):
(nameplate capacity)
Operating cost:

Availability


Heat production


Fuel consumption


Electricity production (Source: carma.org)

MWh year
0.0 2000
627,406.00 2007
3,551,820.00 2020

Emissions (Source: carma.org)

name emissions_kg year
Carbon Dioxide 0.0 2000
Carbon Dioxide 822,110,000.00 2007
Carbon Dioxide 4,011,920,000.00 2020

References and notes (no data)

822,109,870.415 kg
822,109.87 tonne
0 kg
0 tonne
4,011,924,762.089 kg
4,011,924.762 tonne
1,310.429 kg
1.31 tonne
0 kg
0 tonne
1,129.445 kg
1.129 tonne


Facts about Banjarmasin (asam-asam) PowerplantRDF feed
Annual Carbonemissions2000 kg0 kg (0 tonne) +
Annual Carbonemissions kg822,109,870.415 kg (822,109.87 tonne) +
Annual Carbonemissionsnextdecade kg4,011,924,762.089 kg (4,011,924.762 tonne) +
Annual Energyoutput2000 MWh0 MWh +
Annual Energyoutput MWh627,406 MWh +
Annual Energyoutputnextdecade MWh3,551,819 MWh +
CarmaId3196 +
CityBanjarmasin +
ContinentAsia +
CountryIndonesia +
Intensity2000 kg CO2 per MWh elec0 kg (0 tonne) +
Intensity kg CO2 per MWh elec1,310.429 kg (1.31 tonne) +
Intensitynextdecade kg CO2 per MWh elec1,129.445 kg (1.129 tonne) +
Latitude-3.324 +
Longitude114.591 +
OwnercompanyPt PLN Persero +
Point3.3244156265963 S, 114.59099650383 ELatitude: -3.3244156265963
Longitude: 114.59099650383
+
StateSouth Kalimantan +
Personal tools
Namespaces

Variants
Actions
Navigation
Portals
Advanced
Toolbox